News

News about us and our industry

NEWS

Trustify – Our rating platform

23 September 2020 By Alexandra Imfeld in HP Gasser News

Knee winter service at HP Gasser AG

14 December 2018 By Alexandra Imfeld in Membrane construction

The plumbing company Prétôt SA from Le Locle has been working with HP Gasser AG for around 20 years. When it came to renewing the rooflights during a flat roof renovation project in the summer, the specialists from Lungern were quickly on board. And they did so on the time-honored roof of the metal processing

Tagged under:

The real Minergie craftsman exit

It is often an energetic weak point in the building envelope and yet it is needed: the craftsman’s exit. Reason enough for HP Gasser AG to develop a Minergie-compatible roof exit with optimal thermal insulation (U-value 0.2 W/m2K). The HPG craftsman’s exit is available in the basic version with dark flap and manual opening as

Tagged under:

HP Gasser AG has been building airdomes for more than 20 years now – in Switzerland as well as abroad. Even then, the first projects were realized with small windows integrated directly into the fabrication. Since then, our task sheet has repeatedly included the request for window surfaces that can be integrated into large areas

After more than 340 performances, the 2018 annual tour of Circus Knie traditionally ends before Advent. The tents are assembled and disassembled about 40 times per season. 60 helpers need about 6 hours each time. Soon, all material will be stored in the winter quarters in Rapperswil-Jona. Before that, however, the big “winter service” at

Tagged under:

“The ready-made roof window elements from HP Gasser AG also prove their worth in conversions.” This is the conclusion of Stefan Hintermann, managing director of the timber construction and roofing company Hintermann & Ruffini SA from Avegno. Hintermann’s company recently put this to the test as part of an attic renovation project for a house

Tagged under: ,

Walkable heavyweight

Glazing installed at ground level is ideally suited to illuminate rooms below with daylight. The requirements for such glazing are high. According to the standard, the glass must be designed to be walkable, which results in a corresponding glass structure. In the case of the element recently installed in Zermatt, the glass pane measures 2

Tagged under: ,
TOP